Brucejack project. Konkin was appointed the Project Manager for Pretium Resources after it purchased the Snowfields. Brucejack project

 
 Konkin was appointed the Project Manager for Pretium Resources after it purchased the SnowfieldsBrucejack project 6 Billion US$

” This is the only material mineral project that Pretium is required to report. 4. The Brucejack project is located in an area in northwestern BC known as the Golden Triangle, which contains more than 935 mineral occurrences, including ten potential new mines (such as Brucejack. The software allows you to modify information, eSign, annotate, and share files. The Brucejack mine has had three work-related fatalities since its opening in 2017. Procon’s Brucejack Project is a full-service development and production contract delivering 3,800 tpd of ore in Northern BC, Canada. 1, 2018 12:00 a. 47 holes were. Pretium Resources Inc. Actually, about 200 employees are working on the site. About Pretivm . : Brucejack Project Construction Update June 29, 2016 05:00 ET | Source: Pretium Resources Inc. This is common practice for mining companies to actively explore the areas adjacent to existing projects in the hopes of expanding operations into the future. Ian I Chang, M. in 2004 as chief geologist. Contractor: Wildernest Systems Inc. Pretivm Reports COVID-19 Outbreak at Brucejack, Temporarily Restricts Travel. Pretium Resources Inc. Pretivm is creating value through gold at its high-grade gold Brucejack Project, located in northern British Columbia. Sc. Pretium Resources has secured all the major regulatory permits that are needed to begin development at its 100%-owned Brucejack Gold project in northern. 1 Brucejack Deposit mineralization within context of porphyry systems. , P. The Gold Report. . 19, is expected in the first half of 2014. The underground mine is planned to operate. Brucejack Gold Mine is a high-grade underground mining operation using the long-hole stoping mining method (both transverse and longitudinal) and cemented paste backfill. With over 200 projects completed around the globe, Procon is a leader in underground contract mining. Pretium And Nisga'a Nation Sign Brucejack Project Cooperation And Benefits Agreement (Update). August 2, 2015. down temperature) Page 87 and 88: more heavily altered than those abo. • On September 1, 2015, we announced that we had been issued all of the major regulatory permits required to begin development work towards commercial production at the Brucejack Project. British Columbia's Golden Triangle is host to some of the world's largest gold deposits. While prepaid forward agreements run the gamut from smaller transactions that fly under the radar to larger transactions that make the headlines, such as the offtake-linked Pretium Resources Inc. The 57-kilometer long transmission line connecting the Brucejack Mine to the BC Hydro power grid was completed on March 21, 2017 and energized on March 31, 2017 following regulatory approval. The Brucejack Project is a gold-silver deposit in northern British Columbia, Canada. Pretivm acquired the mineral rights to the Project in late 2010; however, there has been active exploration in the area dating back to the 1960s. mineral exploration sector. It is located approximately 950 kilometres northwest of Vancouver, 65 kilometres north-northwest of Stewart, and 21 kilometres south-southeast of the Eskay Creek Mine. Brucejack Mine site, March 2016 — Photo courtesy Pretivm Resources Inc. The Company owns the Brucejack and Snowfield Projects (the “Projects”) located in Northwest British Columbia, Canada. The 2020 program will also include drilling at the Koopa Zone, located 30 kilometers east-southeast of Brucejack, the Hanging Glacier Zone, located 4. A Feasibility Study for the Brucejack high-grade development opportunity will commence shortly; Additionally, a PEA on an integrated high-grade underground and bulk tonnage project is planned to. The 57-kilometer long transmission line connecting the Brucejack Mine to the BC Hydro power grid was completed on March 21, 2017 and energized on March 31, 2017 following regulatory approval. , for Pretium Resources. By Lawrence Roulston. A pervasive quartz-pyrite-sericite alteration event predates the main stage of epithermal mineralisation. “The Nisga’a Nation has negotiated some Aboriginal rights over territory that includes some of the ancillary infrastructure, but Brucejack is located approximately 200 kilometres from the nearest. It is a big (reserves of almost 9 million toz gold. Konkin was appointed the Project Manager for Pretium Resources after it purchased the Snowfields-Brucejack. 1 million, an increase of 16% from the. , P. 57/lb, Ag US$24/oz. Brucejack Project - Market Research Reports & Consulting. Vancouver, British Columbia (June 2, 2011; TSX:PVG) - Pretium Resources Inc. The Brucejack Project is located in the Stikine terrane of north-western British Columbia, 50 km north of the town of Stewart. GDMM15845MP-MPThe 2019 Report updates the operating parameters contemplated in the Brucejack Feasibility Study entitled “Feasibility Study and Technical Report Update on the Brucejack Project, Stewart, BC. of silver is estimated to be produced over the life of the Brucejack Project, including the gold and silver recovered into the flotation concentrate . 8 million plus US$56 million in working capital for the first three months of operation after commissioning. It will create 300 permanent jobs during its 22-year life. Pretivm is advancing its 100%owned Brucejack Project in northern British Columbia to - production as a high -grade gold underground mine. It is located approximately 950 kilometres northwest of Vancouver, 65 kilometres north-northwest of Stewart, and 21 kilometres south-southeast of the Eskay Creek Mine. Head Office. Eng. , until Newcrest acquired the company and the mine in March of this year. Brucejack Gold Mine Project Pretium Resources Inc. 8 million. A pervasive quartz-pyrite-sericite alteration event predates the main stage of epithermal mineralisation. Au US$1,788/oz 3 CuEq calculation based on base case metal prices 4 All-in sustaining cost estimation stated in appendix 5 See section below for Mineral Resource. 48 million lb. The Brucejack Project is located in the Stikine terrane of north-western British Columbia, 50 km north of the town of Stewart. Services Ltd. BRUCEJACK GOLD MINE PROJECT: Implementation Schedule (as per CEAA Decision Statement Condition 10. The Brucejack Project is located in northwestern British Columbia. 5 Meters, including 6,700 g/t Gold Over 0. This translates to finding costs of $1. The Company's Brucejack Project is located on the Brucejack Property, which consists of four mining leases and six mineral claims approximately 3,306 hectares. Innovation [MEMLI]). 3 million. Third Quarter 2013 Highlights and Significant Events Announced on July 23, 2013 the discovery of the Cleopatra vein within the Valley of the Kings, and drill results from the ongoing Valley of the Kings Bulk Sample Program (the ”Program”);Brucejack Project - Expressions of Interest has been received successfully! Thank you for apply-mg: and best of luck with your application! Brucejack Project Pretium Resources Inc. is pleased to report on the progress of site construction activities at its high-grade gold Brucejack Project located in northwestern British Columbia. Pretium Resources is still advancing the Brucejack project but is waiting for funding before kicking off the huge construction activities. English Deutsch Français Español Português Italiano Român Nederlands Latina Dansk Svenska Norsk Magyar Bahasa Indonesia Türkçe Suomi Latvian Lithuanian česk. New High-Grade Gold Exploration Discovery at the Golden Marmot Zone Affirms the District-Scale Potential of Brucejack with 72. 6% zinc and 4. Brucejack is the third greenfield mine to be built in B. Brucejack began commercial production in July 2017 and is one of the highest-grade. (PVG:TSX; PVG:NYSE) announced "the results of the 2020 regional grassroots exploration program,. C. advance the Brucejack project, and, as so many know, he was a tireless supporter over the years as we evolved an exciting exploration project into a profitable mine. C. 6 Mt of ore grading 16. . C. P2 Gold Inc. is pleased to report on the progress of site construction activities at its high-grade gold Brucejack Project located in northwestern British Columbia. In 2020, the ramp-up period to a maximum output of 3,800 t/d is complete, with production averaging 1. . a new zone 13 kilometers southeast of the Project. reports the following update for the Valley of the Kings Bulk Sample Program at its Brucejack Project, for which processing is now underway. This project is in the development phase of it’s life cycle, with published reserves and resources along with ongoing exploration and mine construction. 5 kilometers northwest of Brucejack, and the. It is located approximately 950 kilometres northwest of Vancouver, 65 kilometres north-northwest of Stewart, and 21 kilometres south-southeast of the Eskay Creek Mine. 5 g/t Gold Over 53. High-grade intersections in the Flow Dome Zone east of the Brucejack project support results previously reported confirming the presence of either a new stockwork zone or an extension of the. The Porcupine Mine, owned by Newmont, is a surface and underground mine located in Ontario. Pretium signed a US$540 million construction financing package, with the Orion Mine Finance Group and Blackstone Tactical Opportunities. The Company's Brucejack Project is located on the Brucejack Property, which consists of four mining leases and six mineral claims approximately 3,306 hectares. , until Newcrest acquired the company and the mine in March of this year. (SEDAR filings: Pretium Resources IncIn both 2020 and 2021, Pretium has been exploring the areas adjacent to the Brucejack mine, including the construction of “exploration trails” across the alpine landscape. Construction scope of work. 3 . , Puritch, E. : Brucejack Project Mineral Resources Update Technical Report . The Scottie Gold Mine Project is located 32 km north of Stewart, BC, and is situated 20 km north the Premier Gold Mine, 27 km south of Brucejack Mine, and 15 km east of the past-producing Granduc Mine. 5 kilometers northwest of Brucejack, and the. See full list on mining-technology. Pretium Resources Inc. given the features of the Brucejack Project. Alternative high case economics: At US$1,400/ounce gold, US$21/ounce silver and exchange rate of 0. Brazil Potash’s Autazes project halted on permitting suspension. Based on the results of the June 2014 Feasibility Study. is pleased to announce that it has been issued an Environmental Assessment Certificate for its Brucejack Project by the British Columbia Minister of the Environment and. ( Image courtesy of Pretium Resources. $6,100,000,000. A. 3 Memorandum entitled, “Brucejack Project MA/EMA Permitting Phase Responses – to Information Requests from MEM & MOE – Groundwater Quality and QuantityPretium Resources Inc. 9 million in U. An amended feasibility study for Brucejack, based on a new mineral resource estimate for Brucejack's high-grade Valley of the Kings zone, released Dec. Complete form brucejack project - and other documents on your Android device with the pdfFiller app. VANCOUVER, British Columbia, Feb. About Pretivm . British Columbia's Golden Triangle is host to some of the world's largest gold deposits. Share Mining. • Subsequent to our year end, on January 12, 2016, we announced a fifth set of results from the underground infill drill program at the Brucejack Project’s Valley of the Kings. Alternative high case economics: At US$1,400/ounce gold, US$21/ounce silver and exchange rate of 0. 2 million ounces of gold (15. 1. silver, 222. 028. Construction and. 0 SUMMARY1. The Brucejack mine was previously owned by Vancouver-based mining company, Pretium Resources Inc. • On September 1, 2015, we announced that we had been issued all of the major regulatory permits required to begin development work towards commercial production at the Brucejack Project. If the Brucejack project has a AISC of $448. In order to develop this project the company needs just over $400. Pretivm is constructing a high-grade underground gold mine at its Brucejack Project in northern British Columbia with commercial production targeted for 2017. Conveying Rate: 45 t/h (49. March 2016. With the US$540 million construction financing package announced in September. 2014. The mining method at Brucejack is long-hole stoping using a combination of longitudinal and transverse mining, depending on zone width and orientation. Gold production at the Cadia project reduced from 169 262 oz to 133 468 oz, with the project also contributing 22 392 t of copper production. Zijin Mining Group of China recently bought into the project , though further financing is needed. ). The Brucejack Project is a gold-silver deposit in northern British Columbia, Canada. is pleased to report the final set of drill results from the 2015 regional grass-roots exploration program conducted on the property surrounding the Brucejack Project. Mr. Chris Gareau. , Pretivm’s Resource Manager is the Qualified Person, as defined in National Instrument 43-101 Standards of Disclosure for Mineral Projects, responsible for the resource. The life of mine stands currently at around 18-years. The Brucejack Project is located in the Stikine terrane of north-western British Columbia, 50 km north of the town of Stewart. , Robert Quartermain, believes his company's proposed high-grade gold Brucejack project will be able to withstand uncertain gold prices. (SEDAR filings: Pretium Resources Inc. Sc. 57:1 (Snowfield deposit) and 2. 07 million oz = 4. The Ministers issued the certificate with conditions that have given them the confidence to conclude that the Brucejack Project will be constructed, operated andPretivm is a low-cost intermediate gold producer with the high-grade underground Brucejack Mine in northern British Columbia . Also their site shows 30 million oz silver not to mention all. New High-Grade Gold Exploration Discovery at the Golden Marmot Zone Affirms the District-Scale Potential of Brucejack with 72. C. Early Jurassic sedimentary and volcanic rocks of the Lower Hazelton Group host mineralisation. Early Jurassic sedimentary and volcanic rocks of the Lower Hazelton Group host mineralisation. is pleased to announce the following update on the activities underway and planned for 2015 to advance its Brucejack Project. 2 Report entitled, “Brucejack Gold Mine Project: Metal Leaching and Acid Rock Drainage Management Plan”, prepared by Pretium Resources Inc. 6 Billion US$. Big projects require big equipment, and All-West Crane & Rigging, Ltd. The latest reserves update from. Page 83 and 84: Figure 7. Oskar Lewnowski, Chief Investment Officer of the Orion Mine Finance Group, commented, "As. Pretivm is currently looking for Senior Mine Engineers (2) for the Brucejack Project. Pretivm is constructing a high-grade underground gold mine at its Brucejack Project in northern British Columbia with commercial production targeted for 2017. The main focus of the Brucejack project is the Valley of the Kings' site. October 29,. 8 : PRETIUM RESOURCES INC. A. The Financing, which provides for immediate access to US$340 million at closing, will fund a substantial portion of the costs to develop an underground mine at Pretivm's Brucejack Project. com Recommends. All images courtesy of Pretium Resources Up above the treeline in the mountains of northwestern B. Construction and. T. The Company's Brucejack Project is located on the Brucejack Property, which consists of four mining leases and six mineral claims approximately 3,306 hectares. is pleased to report the results from a National Instrument 43-101-compliant Preliminary Assessment for a project option which examines the benefits of combining the mineral resources from its adjacent and wholly-owned Snowfield and Brucejack Projects located in northern British Columbia, Canada. The high-grade gold opportunity at Brucejack, one of the largest and highest-grading undeveloped gold projects in the world, is the catalyst for near-term production, and our focus. ( For Brucejack resource estimates see news release dated February 22, 2011). Brucejack is located in northwestern British Columbia, approximately 65 kilometers north of Stewart, and is owned by Pretium Resources Inc. at this time,” he says. The 2021 Brucejack definition and expansion drill program is anticipated to total approximately 195,000 meters of drilling comprised of in-reserve definition drilling (40%), in-resource and. , 2011 - Technical report and resource estimate on the Brucejack Project Skeena Mining Division British Columbia, Canada; prepared by P & E Mining Consultants Inc. Newcrest's new Canadian mine contributes gold and cashflow North of 60 Mining News – April 29, 2022. Brucejack is a remote and logistically challenging site due to its location above the Knipple Glacier, receiving approximately ten feet of snow per year. Pretium also received $7. 9 lb. Sc. . ’s Golden Triangle, achieved commercial production in July – only eight years after the super high grade Valley of the Kings deposit at the project was discovered. Mitchell Stevens, "and the benefits from the Brucejack project will make an important contribution. 6% to $746. We are dependent on the Brucejack Project for our future operating revenue. The Brucejack gold-silver deposit is located in NW British Columbia, Canada, ~950 km NNW of Vancouver, 65 km. For further information contact:. It has since ramped up to full mine development and production. Pretium Resources Inc. C. How a Feat of Financing Could Turn Brucejack into the Star of an M&A Show. The latest reserves update from. Mr. Pretivm is creating value through gold at its high-grade gold Brucejack Project, located in northern British Columbia. On March 27, 2015, our Environmental Assessment Certificate for the Brucejack Project was issued by the British Columbia Minister of the Environment and Minister of Energy and Mines. Pretivm's near term objectives are to. 2% net smelter returns royalty on production in excess of 503,386 ounces of gold and 17,907,080 ounces of silver. and Vallat, C. Pretium Resources Inc. The high-grade resource is a subset of the bulk-tonnage Brucejack resource which increased by 134% from 2010 to 2011. Pretium Resources Inc. The total project capital cost forecast (the “February 2017 Forecast”) to complete construction of the Brucejack Mine, including contingencies, is US$811. 2. Brucejack gold-silver mine is located about 940 km north of Vancouver, B. In connection with the forward-looking information contained in this news release, we have made certain assumptions about, among other things: our business and operations and that no significant. , Brown, F. Porcupine Mine. The Brucejack high-grade project is planned to commence as an underground mining operation, with small-scale open pit mining commencing near the depletion of the underground mining inventory. EN. 42 million oz. Pretivm Records Third Quarter 2020 Operating and Financial Results; Brucejack Continues to Deliver Strong Cash Flow and Remains On-Track to Achieve 2020 Guidance. Pretivm is advancing the high-grade, underground gold opportunity at Brucejack and the open pit opportunities at both Brucejack and Snowfield. 5 Meters Stephanie Wafforn, P. For the Valley of the. has sent out 172 layoff notices after negotiations failed with Pretivm to continue contract work at Brucejack Mine, according to Tsetsaut owner Darlene Simpson. 6 Billion US$. Lots of challenging work to do, so if you thrive in a fast paced and energetic work environment, reach out to. It is located approximately 950 kilometres northwest of Vancouver, 65 kilometres north-northwest of Stewart, and 21 kilometres south-southeast of the Eskay Creek Mine. Brucejack. The company began work on the project in June 2016 with two cranes and six operators, and, at the peak of construction, fielded five cranes and over 20. The Brucejack project is about 65 kilometers north of the town of Stewart in Northwestern British Columbia, Canada. ” The Company's Brucejack Project is located on the Brucejack Property, which consists of four mining leases and six mineral claims approximately 3,306 hectares. 5 Meters, including 6,700 g/t Gold Over 0. Brucejack Mine Capit al Cost Forecast . Brucejack Transmission Line Energized . Newcrest owns and operates a portfolio of operating mines and exploration projects located in Australia, Canada and Papua New Guinea. It is located approximately 950 kilometres northwest of Vancouver, 65 kilometres north-northwest of Stewart, and 21 kilometres south-southeast of the Eskay Creek Mine. A pervasive quartz-pyrite-sericite alteration event predates the main stage of epithermal mineralisation. (Image courtesy of Newcrest Mining. in accordance with National Instrument 43101 - for its Brucejack Project, where construction and development continues on schedule for commissioning of the underground mine in mid-2017. Prins has extensive experience in the evaluation, design, planning and execution stages of mining projects. The combined bulk tonnage resource at Brucejack and. Konkin was appointed the Project Manager for Pretium Resources after it purchased the Snowfields. gold = $652. 5 million. (“Pretivm”) is pleased to report positive results from a National Instrument 43-101-compliant Preliminary Economic Assessment (“PEA”) for the high-grade gold and silver resources identified to date at its Brucejack Project in northern British Columbia. Based on the Preliminary Assessment, the Snowfield-Brucejack Project would be operated as an open pit mine with an estimated 27 year mine life and life-of-mine waste to mineral material stripping ratios averaging 0. All images courtesy of Pretium Resources Up above the treeline in the mountains of northwestern B. Pretium Resources Inc. Engineering and permitting activities for the Brucejack Project continue to advance. Approximately the last 10 km of the roadto the mine site extends across Knipple Glacier. The 57-kilometer long transmission line connecting the Brucejack Mine to the BC Hydro power grid was completed on March 21, 2017 and energized on March 31, 2017 following regulatory approval. A. — Photo courtesy Pretium Resources Oskar Lewnowski, Chief Investment Officer of the Orion Mine Finance Group, commented, "As one of the largest investors dedicated to the mining industry, we are delighted to provide a portion of this comprehensive funding solution to the. Denver-based royalty company Royal Gold owns a 2% net smelter return royalty on the mine. ) Newcrest Mining (ASX, TSX: NCM) is expanding its footprint in Canada, particularly in British Columbia’s Golden Triangle, after. Pretivm acquired the mineral rights to the Project in late 2010; however, there has been active exploration in the area dating back to the 1960s. 067 million ounces of refined gold and 26. The deposit was discovered in 2009 by Silver Standard Resources and a year later, Pretium Resources had its IPO and acquired the. advance the Brucejack project, and, as so many know, he was a tireless supporter over the years as we evolved an exciting exploration project into a profitable mine. 25, 2021 (GLOBE NEWSWIRE) -- Pretium Resources Inc. Based on the Preliminary Assessment, the Snowfield-Brucejack Project would be operated as an open pit mine with an estimated 27 year mine life and life-of-mine waste to mineral material stripping ratios averaging 0. Robert Quartermain, now co-chairman of Dakota Gold (NYSE American: DC), recalled in another session how Orion showed flexibility and trust in his plan to develop the Brucejack project in British. This past Monday, Silver Standard announced the results of a preliminary economic assessment combining its Snowfield and Brucejack projects. C. 4 grams of gold per tonne after application of the Mine Call. It is located approximately 950 kilometres northwest of Vancouver, 65 kilometres north-northwest of Stewart, and 21 kilometres south-southeast of the Eskay Creek Mine. The Brucejack project is located in an area in northwestern BC known as the Golden Triangle, which contains more than 935 mineral occurrences, including ten potential new mines (such as Brucejack. 1 of 5 A worker conducts core sample processing at Pretium Resources Inc. By Lawrence Roulston. In its announcement, Newcrest said it expected “synergy benefits” of $15 million to $20 million per year from the acquisition and called Brucejack “one of the highest-grade operating gold. Updated Mineral Resource Estimate Confirms Geological Model for Mine Production PlanningPretivm is creating value through gold at its advanced-staged exploration projects Brucejack and Snowfield, located in north-western British Columbia. ). Pretium Resources has secured a mine permit for its new $750m Brucejack project in British Columbia, Canada, and has passed all provincial and federal environmental agency approvals. The Company is pleased to announce that David Prins has been appointed Project Director for the Brucejack Gold Project and will be responsible for all aspects of the Project’s construction, commissioning and transition to operations. Pretium Resources reported financial results for its Brucejack project, demonstrating that the mine continues to deliver strong cash flow, and is on track to meet its FY/20 guidance. Brucejack Mine – Cash Generating Since Start-Up December 3, 2019 Scotia Bank Mining Conference 2019. m. Suite 2300, Four Bentall Centre, 1055 Dunsmuir Street PO Box 49334 Vancouver, BC V7X 1L4The Company's Brucejack Project is located on the Brucejack Property, which consists of four mining leases and six mineral claims approximately 3,306 hectares. P2 Gold Inc. The Valley of the Kings zone is the “heart of the Brucejack Project. Owner Pretium has taken steps to minimize tailings risks by backfilling about half its mine waste in a paste mixed with cement in the underground mine. If the Brucejack project has a AISC of $448. ( For Brucejack resource estimates see news release dated February 22, 2011). All Brucejack figures relating to FY22 represent the period since Newcrest’s acquisition. The Project includes the past-producing Scottie Gold Mine that operated from 1981 to 1985, and produced 95,426 oz gold at an average grade of 16. the project capital costs and initial working capital for the Brucejack Mine are expected to be fully funded. With the transitions in Pretivm’sPretivm is advancing its 100%-owned Brucejack Project in northern British Columbia to production as a high-grade gold underground mine. Subsequent to the end of the quarter, on April 2, 2015, we announced that we had entered into a comprehensive Cooperation and Benefits Agreement with the Nis ga’a Nation (“the Agreement”) in respect of our Brucejack Project. 5 kilometers northwest of Brucejack, and the. 6 (con’t)Brucejack Prope. Procon’s Brucejack Project is a full-service development and production contract delivering 3,800 tpd of ore in Northern BC, Canada. Pretivm is advancing its 100%owned Brucejack Project in northern British Columbia to - production as a high -grade gold underground mine. GDMM15845MP-MP The 2019 Report updates the operating parameters contemplated in the Brucejack Feasibility Study entitled “Feasibility Study and Technical Report Update on the Brucejack Project, Stewart, BC. Brucejack began commercial production in July 2017 and is one of the highest-grade operating gold mines in the world. • Create and coordinate management systems for all solid waste for the Brucejack Project. Newcrest intends to pursue growth with continued investment in Brucejack Offer unanimously recommended by Pretivm’s Board of Directors Investor conference call at 3:30 pm PT (6:30 pm ET. Brucejack. The Brucejack Project is located in the Stikine terrane of north-western British Columbia, 50 km north of the town of Stewart. Opportunity to retain exposure to Brucejack, while gaining exposure to Newcrest’s diversified portfolio of high-quality, long life, tier one assets. 6 STPH) Conveying Angle: 70 degrees. VANCOUVER, BRITISH COLUMBIA--(Marketwire - July 7, 2011) - Pretium Resources Inc. The operation was impacted by lower mill throughput. Page 89 and 90: Figure 7. The Energy Report. Canadian. There are no established mineral reserve estimates with respect to the Brucejack Project. BC. 7 g/t Ag; Pretium, 2016). The Technical Report for the Brucejack Project Feasibility Study is expected to be filed on SEDAR within 45 days and will also be available at Ian I Chang, M. Brucejack is an underground gold and silver mine. 5 kilometers northwest of Brucejack, and the. The Company's Brucejack Project is located on the Brucejack Property, which consists of four mining leases and six mineral claims approximately 3,306 hectares. BRUCEJACK GOLD MINE PROJECT TSETSAUT/SKII KM LAX HA NATION TRADITIONAL KNOWLEDGE AND TRADITIONAL USE REPORT June 2014 Project #0194150-0020-0090 Citation: ERM Rescan. The Brucejack Project is subject to a 1. The Company's Brucejack Project is located on the Brucejack Property, which consists of four mining leases and six mineral claims approximately 3,306 hectares. Pretivm is advancing its 100%-owned Brucejack Project in northern British Columbia to production as a high-grade gold underground mine. It is located approximately 950 kilometres northwest of Vancouver, 65 kilometres north-northwest of Stewart, and 21 kilometres south-southeast of the Eskay Creek Mine. Capital expenditures to the end of Q3 2015 for the development of the Brucejack Project have totaled US$66 million. It is located approximately 950 kilometres northwest of Vancouver, 65 kilometres north-northwest of Stewart, and 21 kilometres south-southeast of the Eskay Creek Mine. Konkin was appointed the Project Manager for Pretium Resources after it purchased the Snowfields-Brucejack Project from Silver Standard in 2010. Third Party Review Completed. Share this article. 6M on 367,428 oz of gold sold. Mr. This past Monday, Silver Standard announced the results of a preliminary economic assessment combining its Snowfield and Brucejack projects. Geo. The Brucejack project spans 1,200 square kilometres in the heart of British Columbia’s Golden Triangle, which has a 100-year mining history and also hosts the Red Chris, Eskay Creek and Snip. Pretium Resources Inc. It consists of a high-grade resource, the Brucejack Project, in advanced-stage exploration; and a. Geo. The underground mine is planned to operate. PROJECT OVERVIEW. Of this, 11 holes comprising 3693 metre were targeted at VOK (Valley of the Kings), and 2 holes, totalling 1119 metres at the footwall of West zone. The ore is crushed underground and conveyed to the surface where the fully enclosed mill produces gold. On February 3, 2017, we announced that the total project capital cost forecast to complete. Road crews continue to work from both ends of the planned access road extending from the Brucejack Project to Highway 37. Pretivm is advancing its 100%-owned Brucejack Project in northern British Columbia to production as a high-grade gold underground mine. It is owned by Pretium Resources and produced an estimated 347. 2020 Brucejack Mine Total Proven and Probable Mineral Reserve Estimate. She said she and her husband and co-owner George Simpson were “gutted on rates. 8Brucejack. We welcome Jeane Hull to the Board and Richard O’Brien to the role of Board Chair as Pretivm enters the next chapter as a successful company. in four years. The Technical Report for the Brucejack Project Feasibility Study is expected to be filed on SEDAR this month and will also be available at Ian I Chang, M. 3 announcement that the Brucejack project timeline had been accelerated "with dry commissioning now scheduled to commence in March 2017 and. Brucejack offers significant near mine and district-scale exploration opportunities with exciting potential to realise resource and reserve growth. (SEDAR filings: Pretium Resources IncThe project hosts another 1. Mitchell Stevens, "and the benefits from the Brucejack project will make an important contribution. Eng. On track to deliver FY23 guidance following solid H1 operating and financial performance. $6,100,000,000. Mineral processing will be based on conventional gravity concentration and sulphide flotation, producing gold-silver doré and gold-silver flotation concentrate. Kerr-Sulphurets-Mitchell ( KSM) is an active mine exploration project 65 km northwest of Stewart, British Columbia (1,545 km northwest of Vancouver, British Columbia ). The Brucejack project is 100% owned by Pretium Resources (TSX:PVG). Brucejack’s owners say that will take two years and $750 million, Canadian. , dated June 30, 2015. Our only material property for the purposes of NI 43-101 is the Brucejack Project, which has a limited life based on mineral resource estimates. 47 holes were. • Manage water diversions, operate and maintain water pumps, plan and monitor work on sumps, ditches, erosion control, and culvert installations. Sc. After approval, mines can apply for amendments that. Pretium Resources Inc. Page 81 and 82: Figure 7. , Vice President, Project Development, Pretium Resources Inc. Ore is processed using a combination of conventional sulphide floatation and gravity concentration to recover goldPretium Resources Inc. Pretivm is the owner of the Brucejack operation in the highly prospective Golden Triangle region of British Columbia, Canada. Page 85 and 86: more distal (i. Early Jurassic sedimentary and volcanic rocks of the Lower Hazelton Group host mineralisation. The Brucejack project spans 463 square miles. 57 Figure 9. August 2, 2015. Brucejack Project, costs and timing of future exploration, results of future exploration and drilling, production and processing estimates, capital and operating cost estimates, timelines and similar statements relating to the economic viability of the Brucejack Project, timing and receipt of approvals, consents and permits under applicable. economic viability of the Brucejack Project ; timing and receipt of governmental, regulatory and third party approvals, consents, licenses and permits; obtaining required. The Havieron Project is operated by Newcrest under a Joint Venture Agreement with Greatland Gold. Based on the results of t he June 2014 Feasibility Study, Brucejack is expected to produce an average of 504,000 ounces of goldPretium will use the proceeds as working capital for its 100%-owned Brucejack gold mine project and for general corporate purposes. MINFILE No 104B 196.